A foundation replacement in 5 steps:
1. We transfer the weight of the structure to the temporary shoring so that the existing foundation is supported throughout the process.
β
2. A trench is dug underneath the house to allow space for a new footing installation.
β
3. A sill plate is installed to provide firm anchoring material for new foundation bolts.
β
4. New rebar steel, bolts, and wooden forms are installed throughout the trench to receive the concrete.
5. Concrete is pumped directly into the forms and must be allowed time to fully cure, before the wooden forms are removed. Once the forms are removed, the structure is attached to the new foundation and stucco is ready to be added.
Is your home in need of a foundation changeout? Fill out our inspection form through the link in our bio and one of our representatives will contact you to schedule a FREE inspection and estimate π·π½ββοΈ
Shoutout to all those who specialize in foundation repairing πππ Crawlspace foundation work is underrated because itβs some of the toughest work in the game, but often goes unnoticed because the results are hidden behind walls of concrete. We appreciate all those who get down and dirty to protect homes and families